Nuhoğlu İnşaat Catalog
The construction of the sewer system which took place in Osmaneli Bilecik and is completed under the guarantee and quality of Nuhoğlu Construction, includes the constructing of sewer network line by concrete pipes, sewer cummulator line by concrete pipes, sewer parcel connection line, soil stabilazation, sewer quantitive working drawing measurement calculation, plottings and drawings, and also sewer network, receiver and collector lines scannings. Public and environment health are taken into consideration in maximum degree from the beginning of the project to the end. 42.300 m network line, 6.036 m parcel connection line, 1.034 prefabricated examination chimneys and 1.972 prefabricated parcel chimneys are constructed in total. GÖLCÜK (KOCAELİ) POTABLE WATER CONSTRUCTION Gölcük potable water supply network which was badly damaged in the devastating Gölcük earthquake in 1999, was redesigned precisely by Nuhoğlu Construction based on the estimated population data for 2035 and was completed studiously and quickly in 2003. In this project where high quality matearials are used, modern tecniques are applied, human health is taken into consideration carefully in any respect; there are 56 cm in diameter HDPE polyethylene pipes, 135 km long distribution network and also 350 km pipe installation varies in diameter and feature. The project includes, 5 different wells and 2 dams that were used as water sources and a catchment station. Water cummulated in 5 deep wells is pumped into the reservoir via 2 grouped lifting station main which is 4.091 m long in total. To feed the network, there are two 500 m 3 and one 700 m 3 reservoirs. Gölcük Water Network is completely renewed with this project and also 3.400 new subscribers are connected to the network. BİLECİK SEWER SYSTEM CONSTRUCTION 85 84
RkJQdWJsaXNoZXIy MjIxMTc=