Previous Page  82-83 / 116 Next Page
Information
Show Menu
Previous Page 82-83 / 116 Next Page
Page Background

Within the scope of the project, Kağıthane, Alibeyköy, Ayvalıdere and Şirindere

streams are being improved. At the same time, wastewater problems of the

following districts which are in the 1 st region; Bağcılar, Bahçelievler, Bakirköy,

Beyoğlu, Beşiktaş, Eyüp, Güngören, Esenler, Bayrampaşa, Kağıthane, Alibeyköy,

Küçükçekmece, Sarıyer, Şişli, Zeytinburnu and Sultangazi are being ironed out.

Within this project which is completed for İSKİ, problems ongoing for a long

time and posing distress for the habitants are being worked out as well as

possible disasters and floods are avoided.

WASTEWATER

AND RAIN-WATER

TRENCEHES

CONSTRUCTION

83

82