Within the scope of the project, Kağıthane, Alibeyköy, Ayvalıdere and Şirindere
streams are being improved. At the same time, wastewater problems of the
following districts which are in the 1 st region; Bağcılar, Bahçelievler, Bakirköy,
Beyoğlu, Beşiktaş, Eyüp, Güngören, Esenler, Bayrampaşa, Kağıthane, Alibeyköy,
Küçükçekmece, Sarıyer, Şişli, Zeytinburnu and Sultangazi are being ironed out.
Within this project which is completed for İSKİ, problems ongoing for a long
time and posing distress for the habitants are being worked out as well as
possible disasters and floods are avoided.
WASTEWATER
AND RAIN-WATER
TRENCEHES
CONSTRUCTION
83
82