Previous Page  88-89 / 116 Next Page
Information
Show Menu
Previous Page 88-89 / 116 Next Page
Page Background

AGE DEFYING ROADS,

VIADUCTS AND INTERSECTIONS

Road border, pavement and infrastructure works:

Nuhoğlu Construction,

to built clean, contemporaneous and modern cities; carried out and put into practise

road, border, pavement constructions and infrastructure projects and continues to

do so. Infrastructure, border and pavement constructions of Kozyatağı, Acıbadem,

Göztepe, Fenerbahçe, Koşuyolu, Suadiye and Bostancı quarters and Anatolian side

pedway border and pavement constructions and repairs are some of these works.

Bağcılar Mahmut Bey Street regulation and pedestrianization:

The

project includes regulation and pedestrianization works on three diffrent streets

of Bağcılar, installation of the existing electricity lines under the ground, pavement

renewals for modernization in Bağcılar, pedestrianization on Kirazlı street by using

plate stones and natural bazalt plates.

Bağcılar Mehmet Akif Boulevard:

The project includes approximately 4 km

and 22.000 m² pavement renewal as well as heightening of 8 km long steam

partitions, making railings and arranging road level with precast and landscaping

of main refuge.

Çekmeköy Roads and Intersections:

The project including construction of

various road and links as well as junctions that Çekmeköy region needs.

Lightening of Coastal Road and parks between Kadıköy and Tuzla:

The

project includes 1.930 lampposts, 206 kilometres long armored underground cable,

65 kilometres long coastal road lightening by using high luminescenced lightening

armatures.

89

88